logo
ProjectClosed

Franklin Boulevard Culvert Replacement

Closed · Idaho · Last reported Apr 2023

Source: Dodge USA

The project consists of the replacement of an existing deteriorated culvert with a corrugated metal arch pipe. Temporary in-water work will consist of the Tenmile Creek diversion during construction. The project includes installing two (2) 24" steel casings for future utilities, restoring and repaving of the roadway at the culvert approaches, and some utility relocations. Work is anticipated to be

Status
Closed
Sector
Metal, Water Supply and Storage, Power Transmission, Steel, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
Location
Nampa, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Franklin Boulevard Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Franklin Boulevard Culvert Replacement” is an infrastructure initiative in the Metal sector, located in Nampa, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the replacement of an existing deteriorated culvert with a corrugated metal arch pipe. Temporary in-water work will consist of the Tenmile Creek diversion during construction. The project includes installing two (2) 24" steel casings for future utilities, restoring and repaving of the roadway at the culvert approaches, and some utility relocations. Work is anticipated to begin on, or within 15 days after, October 1, 2023

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Nampa

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Power Transmission, Steel, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project