Franklin Elementary Field Improvements
One of 10,000+ projects Taiyo tracks in Iowa.
Source: Dodge
The project includes the replacement of the existing track and field with a new 6 lane track and turf field. The project will also include a new concession building, bleachers, amenity spaces, and required utilities and paving to serve the facility.
- Status
- Closed
- Sector
- Consumer Products, Government, Commercial, Raw Materials, Power Transmission, Car parking, Power Generation (CCGT), Automotive, Road
- Location
- Marshalltown, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Franklin Elementary Field Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the replacement of the existing track and field with a new 6 lane track and turf field. The project will also include a new concession building, bleachers, amenity spaces, and required utilities and paving to serve the facility. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Marshalltown |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Government, Commercial, Raw Materials, Power Transmission, Car parking, Power Generation (CCGT), Automotive, Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
