logo
ProjectClosed

Franklin Elementary School Restroom Remodel

Closed · California · Last reported Mar 2025

Source: Dodge

Demo and replace tiles, stalls, soap dispensers, mirrors, and paper towel dispensers. Install firerated color stalls. Install gray ceramic tiles with gray grout from floor to ceiling. Pressure wash, patch, and repair flooring; apply new epoxy finish. Clean, prep, and repaint existing painted areas with white semi-gloss. Install new LED lighting. Toilets, Urinals, and faucets will be owner bought a

Status
Closed
Sector
Commercial, Forest Products and Packaging, Education, Government
Location
Oakland, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Franklin Elementary School Restroom Remodel

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Franklin Elementary School Restroom Remodel” is an infrastructure initiative in the Commercial sector, located in Oakland, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Demo and replace tiles, stalls, soap dispensers, mirrors, and paper towel dispensers. Install firerated color stalls. Install gray ceramic tiles with gray grout from floor to ceiling. Pressure wash, patch, and repair flooring; apply new epoxy finish. Clean, prep, and repaint existing painted areas with white semi-gloss. Install new LED lighting. Toilets, Urinals, and faucets will be owner bought and provided and contractor installed. Contractor is responsible for Hazmat removal and will need ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Oakland

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Commercial, Forest Products and Packaging, Education, Government

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project