Franklin Lithium Brine Project
Planned · Texas · Last reported Nov 2025
Source: Mining.com
The Franklin project is a lithium brine resource in northeast Texas with the highest lithium-in-brine grades in North America. It involves extracting lithium chemicals using direct lithium extraction (DLE) technology from brine in the Smackover limestone formation. The project aims to produce over 100,000 tonnes per year of lithium chemicals through multiple phases.
- Status
- Prospective
- Sector
- Manufacturing (Industrial)
- Location
- Mount Vernon, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Mining.com
ConstructChat
Ask ConstructChat about Franklin Lithium Brine Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Franklin project is a lithium brine resource in northeast Texas with the highest lithium-in-brine grades in North America. It involves extracting lithium chemicals using direct lithium extraction (DLE) technology from brine in the Smackover limestone formation. The project aims to produce over 100,000 tonnes per year of lithium chemicals through multiple phases. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Texas |
City | Mount Vernon |
Source
Source | Mining.com |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial) |
Article published date | 2025-11-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in USA
- Daniel Webster Western Beltway Resurfacing Improvements
- Central West Central Florida DMS CCTV Camera Installation
- Floridas TurnpikeSR 91 and Claude Pepper Memorial HighwayUS 27 Interchange Improvements Project
- Turnpike Resurfacing and Improvements MP 190 to MP 198
- Turnpike Roadside and Safety Improvements CR 470 to I75
- Turnpike Resurfacing Improvements MP 260 to MP 265
- FY25 standing request for tree care - pruning, removals, stump grinding, chemical injections, etc.
- Widen Sawgrass from North of Oakland Park Blvd to South of Atlantic Blvd
