Frasier Solar Project
Sector: Road • Location: Knox County, Ohio, United States
Source: Ohio Capital Journal
The Frasier Solar project is a 120-megawatt dual-use solar agrivoltaics project planned to be built on an 840-acre site in Knox County, Ohio. The project faced local opposition and misinformation but was approved by the Ohio Power Siting Board due to neutral stances from Knox County and Clinton Township. The project is expected to add more than $40 million to local governments over its 40-year use
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | awarded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Frasier Solar project is a 120-megawatt dual-use solar agrivoltaics project planned to be built on an 840-acre site in Knox County, Ohio. The project faced local opposition and misinformation but was approved by the Ohio Power Siting Board due to neutral stances from Knox County and Clinton Township. The project is expected to add more than $40 million to local governments over its 40-year useful life through a payment arrangement instead of property taxes. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Morphotek’s New Biologics Production Facility
- LabCentral 238, Cambridge, Massachusetts, USA
- Kite Pharma’s Viral Vector Manufacturing Facility, California, US
- Eli Lilly’s Parenteral Product and Device Manufacturing Facility, Concord, North Carolina
- Amgen’s Drug Substance Manufacturing Plant, Wake County, North Carolina
- Vertex Pharmaceuticals’ Boston Campus
- Roche Diagnostics PCR Diagnostic Kits
