Frayser Park & Pine Hill Park Playground Site Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Frayser Park project consists of the following scope of work: clearing and grubbing for the installation of a playground within an existing park (Frayser Park) that includes: tree/shrub removal, metal pole removal, utility pole/service relocation, as well as removal of concrete pad & curbing. The project includes the installation of two large play structures, and two sets of swings, rubberized saf
- Status
- Prospective
- Sector
- Government, Metal, Commercial, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Cement, Car parking, Automotive
- Location
- Memphis, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Frayser Park & Pine Hill Park Playground Site Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Frayser Park project consists of the following scope of work: clearing and grubbing for the installation of a playground within an existing park (Frayser Park) that includes: tree/shrub removal, metal pole removal, utility pole/service relocation, as well as removal of concrete pad & curbing. The project includes the installation of two large play structures, and two sets of swings, rubberized safety surfacing (with subsurface drainage system), seatwalls, concrete sidewalks, trails, concrete ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Memphis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Metal, Commercial, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Cement, Car parking, Automotive |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
