Frazier Road Elevated Tank
Sector: Power Generation (CCGT) • Location: Big Spring, Texas, United States of America
Source: Dodge USA
This project includes the base bid for construction of 250,000 gallon spheroid elevated tank including all site work, electrical, piping, valves, SCADA, and incidentals. Alternate bid items are included for varying tank sizes and types of tank construction. Project also includes the construction of tank fill valve vault including all site work, electrical, piping, valves, SCADA and incidentals. Al
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Consumer Products, Government, Commercial, Raw Materials
- Location
- Big Spring, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Frazier Road Elevated Tank
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the base bid for construction of 250,000 gallon spheroid elevated tank including all site work, electrical, piping, valves, SCADA, and incidentals. Alternate bid items are included for varying tank sizes and types of tank construction. Project also includes the construction of tank fill valve vault including all site work, electrical, piping, valves, SCADA and incidentals. Alternate bids will be received for 300,000 and 500,000 gallon spheroid tanks as well as 250,000, 3... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Big Spring |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Consumer Products, Government, Commercial, Raw Materials |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
