FRED 310 Industrial Building B Shell
Sector: Metal • Location: South Hill, Washington, United States of America
Source: Dodge USA
Fred 310 Building B consists of 36' clear height, 398,188 SF Semi Heated Shell Tilt-up building. Project is built on 27.79 Acres of land. Site work consists of Clearing/Grubbing, Earthwork, Utilities, Site Concrete, Fencing, Asphalt Paving, and Striping/Signage. Additional Project scope includes but is not limited to Concrete complete, Reinforcing Steel, Pre Engineered Steel Stairs, Structural Ste
- Status
- Closed
- Sector
- Metal, Warehouse, Steel, Cement, Manufacturing (Industrial), Road, Power Transmission, Power Generation (CCGT), Commercial
- Location
- South Hill, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FRED 310 Industrial Building B Shell
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fred 310 Building B consists of 36' clear height, 398,188 SF Semi Heated Shell Tilt-up building. Project is built on 27.79 Acres of land. Site work consists of Clearing/Grubbing, Earthwork, Utilities, Site Concrete, Fencing, Asphalt Paving, and Striping/Signage. Additional Project scope includes but is not limited to Concrete complete, Reinforcing Steel, Pre Engineered Steel Stairs, Structural Steel, Steel Erection, Exterior Canopies, Roof Structure, Flashing/Sheet Metal, TPO Roofing with R-3... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | South Hill |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Warehouse, Steel, Cement, Manufacturing (Industrial), Road, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
