Fred Meyer #214 Remodel
Bid results · Washington · Last reported Aug 2024
Source: Dodge USA
The Scope Of Work Includes The Upgrade And Re-location Of Shelving And Fixtures At Food Preparation And Sales Areas. Two New Walls And Doors Are Scheduled At The Deli Prep Area And Storage Area At The Front End Of The Store. The Exterior To Receive New Paint And Signage
- Status
- Closed
- Sector
- Commercial, Residential, Manufacturing (Industrial)
- Location
- Spokane, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fred Meyer 214 Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Scope Of Work Includes The Upgrade And Re-location Of Shelving And Fixtures At Food Preparation And Sales Areas. Two New Walls And Doors Are Scheduled At The Deli Prep Area And Storage Area At The Front End Of The Store. The Exterior To Receive New Paint And Signage |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Spokane |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
