Fred Meyer Distribution Center Driveway
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
Proposal for driveway modifications and addition of a new guard shack at the northwest driveway of the existing Fred Meyer Distribution Center located on 7th St NW. Improvements include the removal of the existing asphalt driveway to be replaced with heavier duty concrete pavement, striped lanes, signage, 80SF guard shack. Project will include site improvements as required.
- Status
- Prospective
- Sector
- Residential, Commercial, Cement, Road, Manufacturing (Industrial)
- Location
- Puyallup, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fred Meyer Distribution Center Driveway
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Proposal for driveway modifications and addition of a new guard shack at the northwest driveway of the existing Fred Meyer Distribution Center located on 7th St NW. Improvements include the removal of the existing asphalt driveway to be replaced with heavier duty concrete pavement, striped lanes, signage, 80SF guard shack. Project will include site improvements as required. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Puyallup |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Cement, Road, Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
