logo

Fredericton - Northside Flood Resiliency Project

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Pre-Construction

This project aims to mitigate the risk of flooding (pluvial & fluvial), increase community resilience, and public safety in a vulnerable area of the City of Fredericton experiencing surcharging & flooding issues. The following sub-projects are key aspects of projects to improve the resiliency to flooding on the Northside of Fredericton: • The Saint Mary’s Street Project (From the St. John River to

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Residential, Road, Government
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Fredericton - Northside Flood Resiliency Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Fredericton - Northside Flood Resiliency Project” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project aims to mitigate the risk of flooding (pluvial & fluvial), increase community resilience, and public safety in a vulnerable area of the City of Fredericton experiencing surcharging & flooding issues. The following sub-projects are key aspects of projects to improve the resiliency to flooding on the Northside of Fredericton: • The Saint Mary’s Street Project (From the St. John River to 320 St. Mary’s Street) will replace and upgrade end-of-life core infrastructure while providing adaptation benefits to high intensity rainfall events through realignment and upsizing of infrastructure. Currently, water flows down St. Mary’s Street with minor flows diverting runoff to the side of the street while major flows continue through to Union Street. • The Crocker Street Project extends from the Nashwaak River through the Canada Street intersection up to the future extension of Pickard Street. The aim is to upgrade and replace end-of-life core infrastructure, which will provide adaptation benefits to high intensity rainfall events. Currently, these types of events cause the existing sewer system to be surcharged. • The Nashwaaksis Outfall / Hillcourt Project will replace sections of storm sewer and sanitary sewer between Main Street and Hillcourt Drive. A portion of the Northside Hill area (Nashwaaksis) drains through a series of sewer system down to the Nashwaaksis Stream. During high intensity rainfalls, this storm sewer can become surcharged which has caused inundation flooding that has impacted residential and commercial properties. This project will result in improvements to multiply City owned assets that will work together to create safe flow routes for water during heavy downpours and river floods, mitigating the risk of pluvial and fluvial flooding, increasing community resilience, and safeguarding water and soil quality.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Residential, Road, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project