logo
ProjectGc Bidding

Freedom Hall Seating Replacement

Gc bidding · Kentucky · Last reported Nov 2024

Source: Dodge USA

Freedom Hall is an arena structure at approximately 121,000 square feet. The structure is comprised of an upper and lower arena bowl structure with concrete rows and risers with permanent seating and a retractable seating platform. The project being undertaken is to replace the existing permanent fold-up seating in the lower bowl portion of the arena, replace the existing portable folding seats in

Status
Under Construction
Sector
Cement, Manufacturing (Industrial), Commercial, Stadium
Location
Louisville, Kentucky, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Freedom Hall Seating Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Freedom Hall Seating Replacement” is an infrastructure initiative in the Cement sector, located in Louisville, Kentucky, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Freedom Hall is an arena structure at approximately 121,000 square feet. The structure is comprised of an upper and lower arena bowl structure with concrete rows and risers with permanent seating and a retractable seating platform. The project being undertaken is to replace the existing permanent fold-up seating in the lower bowl portion of the arena, replace the existing portable folding seats in the lower bowl area, and replace the retractable seating platform and seating at the arena floor...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kentucky

City

Louisville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Manufacturing (Industrial), Commercial, Stadium

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project