Freeport Bridge Project
Sector: Bridge • Location: Freeport, Maine
Source: Maine Department of Transportation (MaineDOT)
MaineDOT will be conducting work on I-295 exits 20 and 22 in Freeport. This work includes a complete reconstruction of the Desert Road and Mallet Drive bridges over I-295. The traveling public should take caution when utilizing these on and off ramps and drive safely and slowly through construction zones.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | MaineDOT will be conducting work on I-295 exits 20 and 22 in Freeport. This work includes a complete reconstruction of the Desert Road and Mallet Drive bridges over I-295. The traveling public should take caution when utilizing these on and off ramps and drive safely and slowly through construction zones. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
