Freestone Flat Road Bridge Replacement (C11004)
Sector: Bridge • Location: California, United States Of America
Source: Sonoma County
The Sonoma County Department of Transportation and Public Works (DTPW) proposes to replace the existing Freestone Flat Road Bridge, which is a two-span, steel-girder truss bridge over Salmon Creek, in the southwest portion of the County. The existing bridge would be replaced with a two-lane, cast-in-place pre-stressed concrete box-girder bridge supported on cast-in-drilled-hole piles at the abutme
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | prospective |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Sonoma County Department of Transportation and Public Works (DTPW) proposes to replace the existing Freestone Flat Road Bridge, which is a two-span, steel-girder truss bridge over Salmon Creek, in the southwest portion of the County. The existing bridge would be replaced with a two-lane, cast-in-place pre-stressed concrete box-girder bridge supported on cast-in-drilled-hole piles at the abutments. The new bridge would be located parallel to and southeast of the existing bridge. The existing bridge would remain in service until the new bridge is complete, then disassembled and removed from the site. Building the bridge on a new alignment requires the construction of new approaches on the east and west sides of the replacement bridge. Existing intersecting roads, including Scott Robin Road and a private driveway, would be modified to meet the new location of Freestone Flat Road as it approaches the bridge. Depending on the environmental review process, the property acquisition process, and the future availability of funding, construction of the Freestone Flat Road Bridge project is estimated to start in 2024. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in United States Of America
- Mid-Higuera Bypass Project
- Huasna Townsite Bridge Replacement
- South Bay Bridge Replacement Project, Los Osos
- Chalk Hill Road Bridge Replacement
- 2009 Roadway and Bridge Surface Preservation Program
- 2018 Maintenance Chip Seals
- El Camino Real Bridge Replacement Project, Santa Margarita
- Lopez Drive Bridge Seismic Retrofit, Arroyo Grande
