logo

Freestone Flat Road Bridge Replacement (C11004)

Sector: Bridge • Location: California, United States Of America

Source: Sonoma County

Project
Prospective

The Sonoma County Department of Transportation and Public Works (DTPW) proposes to replace the existing Freestone Flat Road Bridge, which is a two-span, steel-girder truss bridge over Salmon Creek, in the southwest portion of the County. The existing bridge would be replaced with a two-lane, cast-in-place pre-stressed concrete box-girder bridge supported on cast-in-drilled-hole piles at the abutme

Project Information FAQ

Project Information

4 Q
The project “Freestone Flat Road Bridge Replacement (C11004)” is an infrastructure initiative in the Bridge sector, located in California, United States Of America. Taiyo aggregates data on it from Sonoma County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

prospective

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Sonoma County Department of Transportation and Public Works (DTPW) proposes to replace the existing Freestone Flat Road Bridge, which is a two-span, steel-girder truss bridge over Salmon Creek, in the southwest portion of the County. The existing bridge would be replaced with a two-lane, cast-in-place pre-stressed concrete box-girder bridge supported on cast-in-drilled-hole piles at the abutments. The new bridge would be located parallel to and southeast of the existing bridge. The existing bridge would remain in service until the new bridge is complete, then disassembled and removed from the site. Building the bridge on a new alignment requires the construction of new approaches on the east and west sides of the replacement bridge. Existing intersecting roads, including Scott Robin Road and a private driveway, would be modified to meet the new location of Freestone Flat Road as it approaches the bridge. Depending on the environmental review process, the property acquisition process, and the future availability of funding, construction of the Freestone Flat Road Bridge project is estimated to start in 2024.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data