Freestone Net Metering Project
Sector: Power Transmission • Location: Texas, USA
Source: ChartMill
The Public Utility Commission of Texas approved the net metering application for the co-location of a Cyrus One data center at the Freestone Energy Center site. Constellation Energy signed a 380 MW agreement with CyrusOne to connect and serve a new data center adjacent to the Freestone Energy Center, with an exclusive agreement to provide power, grid connectivity, and site infrastructure for an ad
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Data Center
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- ChartMill
ConstructChat
Ask ConstructChat about Freestone Net Metering Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Public Utility Commission of Texas approved the net metering application for the co-location of a Cyrus One data center at the Freestone Energy Center site. Constellation Energy signed a 380 MW agreement with CyrusOne to connect and serve a new data center adjacent to the Freestone Energy Center, with an exclusive agreement to provide power, grid connectivity, and site infrastructure for an additional 380 MW Phase 2. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | ChartMill |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Data Center |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in USA
- Widen Turnpike SR 91 from Golden Glades Toll Plaza to the Broward County
- Fourth Avenue Corridor Utility Replacement - MEP Bidders
- Utility Work on I-75
- East Hampton Circle Reconstruction
- Stonehill Drive Utility Work
- Utility Repair on 3rd Street North
- Tennessee utility TVA seeks developer for 100-MW battery
- AML3D ARCEMY X Additive Manufacturing Machine for Tennessee Valley Authority
