logo

Freeway Park: Washington State Convention Center Expansion Project, Seattle, Washington

Sector: Cable car • Location: Washington, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

Freeway Park in Seattle, Washington is the Nation’s first park built over a freeway. It opened between 6th and 7th Avenues over Interstate 5 in July 1976 as a celebration of the U.S. bicentennial. The 5.2-acre park, the largest public park in downtown Seattle, was built with Forward Thrust bond funds for residents, shoppers, and visitors to enjoy. The park includes distinct areas tied together by

Project Information FAQ

Project Information

5 Q
The project “Freeway Park: Washington State Convention Center Expansion Project, Seattle, Washington” is an infrastructure initiative in the Cable car sector, located in Washington, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Freeway Park in Seattle, Washington is the Nation’s first park built over a freeway. It opened between 6th and 7th Avenues over Interstate 5 in July 1976 as a celebration of the U.S. bicentennial. The 5.2-acre park, the largest public park in downtown Seattle, was built with Forward Thrust bond funds for residents, shoppers, and visitors to enjoy. The park includes distinct areas tied together by concrete, greenery, and furnishings, along with a series of irregular, linked plazas that are intertwined and enclosed by board-formed concrete planting containers and walls. It includes a 30-foot concrete canyon and Naramore Fountain, which existed before the park was built but was incorporated into the park’s design. The expansion project aims to replace 12 entrances to the main part of the park with four primary entrances located along key city walking routes that pass the park and connect to primary walking routes through the park. Plans currently underway will repair, restore, and enhance Freeway Park’s original features in support of daily use, maintenance, and public programming. Proposed improvements include infrastructure upgrades related to lighting, wayfinding signage, planting, accessibility, entrances, programming, and services; repairs to drainage, irrigation, and seating; new restrooms, play-safe fountains, and permanent storage; and a café, information booth, children’s play area, gateways, and infrastructure for events and daily programming.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data