Frejus Tunnel Improvements
Sector: Tunnel • Location: Italy
Source: European Investment Bank (EIB)
Construction of a second tunnel dedicated only to emergency vehicle traffic - to meet the enhanced minimum safety standards introduced by the Mont Blanc Directive EC/2004/54.
- Status
- Closed
- Sector
- Tunnel, Government
- Location
- Italy
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Frejus Tunnel Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | fully disbursed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a second tunnel dedicated only to emergency vehicle traffic - to meet the enhanced minimum safety standards introduced by the Mont Blanc Directive EC/2004/54. |
Original sector | Transport |
Location
Country | Italy |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Tunnel, Government |
Article published date | 2026-01-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
