logo

French Creek Pollution Control Centre Expansion

Sector: Water Supply and Storage • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

The French Creek Pollution Control Centre (FCPCC) in the Regional District of Nanaimo (RDN) was constructed in 1978 as a conventional activated sludge wastewater treatment plant. The FCPCC was upgraded in 1996 (Stage 2) to a trickling filter/solids contact process. The Stage 3 upgrades, completed between 2006 and 2010, included modifications to the headworks, solids contact tanks, solids thickenin

Project Information FAQ

Project Information

4 Q
The project “French Creek Pollution Control Centre Expansion” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The French Creek Pollution Control Centre (FCPCC) in the Regional District of Nanaimo (RDN) was constructed in 1978 as a conventional activated sludge wastewater treatment plant. The FCPCC was upgraded in 1996 (Stage 2) to a trickling filter/solids contact process. The Stage 3 upgrades, completed between 2006 and 2010, included modifications to the headworks, solids contact tanks, solids thickening and dewatering, and effluent pumping. Stage 4 Expansion (this project) will accommodate growth in the service area. The project will also include other upgrades to replace ageing infrastructure. The FCPCC is reaching its capacity and must ben expanded to avoid overflows and to facilitate growth in the area. The RDN requires a preliminary design report to establish the scope, schedule and cost for the FCPCC Stage 4 expansion.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data