French Nuclear Power Revival EPR2 Expansion
Sector: Nuclear • Location: France
Source: Discovery Alert
France is undertaking a comprehensive nuclear power expansion program called the EPR2 programme, which involves constructing six new high-power reactors at existing sites (Penly, Gravelines, and Bugey) to ensure energy sovereignty, accessibility, and climate change mitigation through low-carbon electricity generation. The program includes reactor life extensions, advanced fuel cycle development, a
- Status
- Prospective
- Sector
- Nuclear, Manufacturing (Industrial), Power Generation (CCGT), Government
- Location
- France
- Updated
- 22 Jul 2026
- Source
- Discovery Alert
ConstructChat
Ask ConstructChat about French Nuclear Power Revival EPR2 Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | France is undertaking a comprehensive nuclear power expansion program called the EPR2 programme, which involves constructing six new high-power reactors at existing sites (Penly, Gravelines, and Bugey) to ensure energy sovereignty, accessibility, and climate change mitigation through low-carbon electricity generation. The program includes reactor life extensions, advanced fuel cycle development, and aims for initial commissioning by 2038. |
Original sector | Energy |
Budget |
Location
Country | France |
Source
Source | Discovery Alert |
URL |
More Details
Record type | Project |
Sector | Nuclear, Manufacturing (Industrial), Power Generation (CCGT), Government |
Article published date | 2026-03-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
