French Quarter Transmission Main Project
Sector: Waste Processing and Treatment • Location: New Orleans, Louisiana, United States
Source: AOL
The Sewerage and Water Board of New Orleans is undertaking the French Quarter transmission main project to replace and upgrade aging infrastructure including transmission mains, drainage lines, sewer lines, and utility services. The project began in September 2025 and is expected to be completed by late fall 2026. It has experienced delays due to events such as Super Bowl LIX, Mardi Gras, high Mis
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Power Transmission, Water Supply and Storage, Power Generation (CCGT)
- Location
- New Orleans, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- AOL
ConstructChat
Ask ConstructChat about French Quarter Transmission Main Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Sewerage and Water Board of New Orleans is undertaking the French Quarter transmission main project to replace and upgrade aging infrastructure including transmission mains, drainage lines, sewer lines, and utility services. The project began in September 2025 and is expected to be completed by late fall 2026. It has experienced delays due to events such as Super Bowl LIX, Mardi Gras, high Mississippi River water levels, discovery of historical artifacts, near-freezing temperatures, and heavy rain. |
Original sector | Water Resources |
Location
Country | United States of America (USA) |
State | Louisiana |
City | New Orleans |
Source
Source | AOL |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Power Transmission, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States
- Queen Elizabeth Way Widening
- Kosciuszko Bridge Replacement Project, New York, US
- Goethals Bridge Replacement Project, New York
- Route 141 Improvement, St. Louis, Missouri
- Pearl Harbor Memorial Bridge, Connecticut, US
- Frederick Douglass-Susan B Anthony Memorial Bridge (formerly Troup Howell)
- Grand Avenue Bridge, Glenwood Springs, Colorado, US
- Johnson County Gateway Interchange Project, Kansas, US
