logo

French Quarter transmission main project

Sector: Waste Processing and Treatment • Location: New Orleans, Louisiana, United States

Source: AOL

Project
Under Construction

The Sewerage and Water Board of New Orleans is undertaking the French Quarter transmission main project to replace and upgrade aging infrastructure including transmission mains, drainage lines, sewer lines, and utility services. The project began in September 2025 and is funded through FEMA's Joint Infrastructure Recovery Request Program. It involves full replacement of 1,600 feet of 24-inch cast

Status
Under Construction
Sector
Waste Processing and Treatment, Power Transmission, Metal, Water Supply and Storage, Power Generation (CCGT)
Location
New Orleans, Louisiana, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about French Quarter transmission main project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “French Quarter transmission main project” is an infrastructure initiative in the Waste Processing and Treatment sector, located in New Orleans, Louisiana, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Sewerage and Water Board of New Orleans is undertaking the French Quarter transmission main project to replace and upgrade aging infrastructure including transmission mains, drainage lines, sewer lines, and utility services. The project began in September 2025 and is funded through FEMA's Joint Infrastructure Recovery Request Program. It involves full replacement of 1,600 feet of 24-inch cast iron transmission mains, replacement or upgrade of 2,000 feet of drainage lines and catch basins, inspection and repair of 1,500 feet of sewer lines, new water and sewer service connections, and upgrades to Entergy electric and Delta gas infrastructure. The project was delayed due to events like Super Bowl LIX, Mardi Gras, high Mississippi River water levels, discovery of historical artifacts, near-freezing temperatures, and heavy rain. It is expected to be completed by late fall 2026.

Original sector

Water and Sewer Infrastructure

Location

Country

United States of America (USA)

State

Louisiana

City

New Orleans

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Power Transmission, Metal, Water Supply and Storage, Power Generation (CCGT)

Article published date

2026-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project