Fresh Impressions Water & Sewer Improvements Phase III
Sector: Water Supply and Storage • Location: South Brunswick Township, New Jersey, United States of America
Source: Dodge USA
The work includes the furnishing of all labor, material and equipment necessary or required to complete all work set forth in these Specifications and shown on the Plans. The estimated item quantities are summarized as follows: APPROXIMATE ESTIMATED ITEM ____ 1. Mobilization LS 2. Clearing Site LS 3. Temporary Soil Erosion and Sediment Control LS 4. Contract Closeout Documentat
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- South Brunswick Township, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fresh Impressions Water & Sewer Improvements Phase III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes the furnishing of all labor, material and equipment necessary or required to complete all work set forth in these Specifications and shown on the Plans. The estimated item quantities are summarized as follows: APPROXIMATE ESTIMATED ITEM ______QUANTITY__________ 1. Mobilization LS 2. Clearing Site LS 3. Temporary Soil Erosion and Sediment Control LS 4. Contract Closeout Documentation FP 5. 8" DIP Water Main 6,600 LF 6. Wet Tap with Valve and Valve Box, 14" x 8" 2 UN 7. 8" Gat... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | South Brunswick Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
