Fresno State Campus Central Plant Utility Replacement (CUPR) Project
Project in operation · California
Source: InfraPPPWorld
The project involves replacing and modernizing the California State University Fresno State campus’ central utility plant, hot and cold-water distribution network, and other energy conservation measures.The private partner will design, construct, finance, and maintain a new plant and ancillary infrastructure, as well as implement various energy efficiency upgrades across the university campus. The
- Status
- Under Construction
- Sector
- Power Transmission, Water Supply and Storage, Education, Natural Gas, Commercial, Power Generation (CCGT), Government
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Fresno State Campus Central Plant Utility Replacement (CUPR) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | project in operation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing and modernizing the California State University Fresno State campus’ central utility plant, hot and cold-water distribution network, and other energy conservation measures.The private partner will design, construct, finance, and maintain a new plant and ancillary infrastructure, as well as implement various energy efficiency upgrades across the university campus. The project installed a cost-effective mix of building efficiency and infrastructure improvements, including HVAC (Heating, Ventilation, and Air Conditioning) controls, energy management systems with reliable HVAC delivery, and lighting and domestic hot water upgrades, to reduce energy import and the university’s carbon footprint.The project guarantees energy savings of over 33% as well as a 73% reduction in natural gas usage. Going forward, the project will contribute to yearly reductions of 7,902 tons of carbon and seven million gallons of water. |
Original sector | Energy, Social & Health, Water & Waste |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Education, Natural Gas, Commercial, Power Generation (CCGT), Government |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in (USA) United States of America
- University of Kentucky Central Utility Plant (CUP) Project
- Georgetown University energy system PPP project
- Metcalf – San Jose B HVDC Project in California
- Runway 13R-31L Reconstruction Project in Houston
- Newark – Northern Receiving Station HVDC Project in California
- Northwest Air Cargo PPP project
- Eastern Michigan University student housing PPP project
- Eastern New Mexico Rural Water System Project
