Fresno State Campus Central Plant Utility Replacement (CUPR) Project
Closed · California
Source: InfraPPPWorld
The project involves replacing and modernizing the California State University Fresno State campus’ central utility plant, hot and cold-water distribution network, and other energy conservation measures.The private partner will design, construct, finance, and maintain a new plant and ancillary infrastructure, as well as implement various energy efficiency upgrades across the university campus. The
- Status
- Closed
- Sector
- Water Supply and Storage, Education, Natural Gas, Power Transmission, Commercial, Power Generation (CCGT), Government
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Fresno State Campus Central Plant Utility Replacement (CUPR) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing and modernizing the California State University Fresno State campus’ central utility plant, hot and cold-water distribution network, and other energy conservation measures.The private partner will design, construct, finance, and maintain a new plant and ancillary infrastructure, as well as implement various energy efficiency upgrades across the university campus. The project installed a cost-effective mix of building efficiency and infrastructure improvements, including HVAC (Heating, Ventilation, and Air Conditioning) controls, energy management systems with reliable HVAC delivery, and lighting and domestic hot water upgrades, to reduce energy import and the university’s carbon footprint.The project guarantees energy savings of over 33% as well as a 73% reduction in natural gas usage. Going forward, the project will contribute to yearly reductions of 7,902 tons of carbon and seven million gallons of water. |
Original sector | Energy, Social & Health, Water & Waste |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Education, Natural Gas, Power Transmission, Commercial, Power Generation (CCGT), Government |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in (USA) United States of America
- Prince George’s County waste processing PPP project
- City of Bayonne water and wastewater P3
- Odessa desalination plant in Texas
- University of Kentucky Central Utility Plant (CUP) Project
- Driverless electric car transit PPP project in East Contra Costa
- Mid-Currituck bridge PPP project in North Carolina
- Biogas and Digestate Management Facilities PPP Project in Riverside
- Operation of Detroit’s water and sewage system
