Freya Utility and Street Improvements
Sector: Water Supply and Storage • Location: Spokane, Washington, United States of America
Source: Dodge USA
This project consists of the construction of approximately4,000 cubic yards of excavation and embankment, 2,200 linear feet of 30 inch water main, 300 linear feet of storm sewer, 13 drainage structures, 3,600 square yards of storm swale construction, 4,000 linear feet of curb and/or gutter, 1,000 linear feet of sidewalk, 11,000 square yards of asphalt pavement, sundry utility adjustments, and othe
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Car parking, Waste Processing and Treatment, Power Transmission, Road, Power Generation (CCGT), Automotive
- Location
- Spokane, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Freya Utility and Street Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the construction of approximately4,000 cubic yards of excavation and embankment, 2,200 linear feet of 30 inch water main, 300 linear feet of storm sewer, 13 drainage structures, 3,600 square yards of storm swale construction, 4,000 linear feet of curb and/or gutter, 1,000 linear feet of sidewalk, 11,000 square yards of asphalt pavement, sundry utility adjustments, and other related miscellaneous items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Spokane |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Car parking, Waste Processing and Treatment, Power Transmission, Road, Power Generation (CCGT), Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
