Fridley Campus Electric Motor Controller
Sector: Power Generation (CCGT) • Location: Minneapolis, Minnesota, United States of America
Source: Dodge USA
A. Furnish all materials, equipment and incidentals required for the Fridley Campus Electrical Rehabilitation VFD and Pump Station 9 Medium Voltage Motor Controller as specified herein. B. The work shall include, but is not limited to, the following: 1. Furnish and provide services for the MVMC as specified in Section 26 08 39. 2. Furnish and provide services for the VFD as specified in Section 26
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planning Schematics |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A. Furnish all materials, equipment and incidentals required for the Fridley Campus Electrical Rehabilitation VFD and Pump Station 9 Medium Voltage Motor Controller as specified herein. B. The work shall include, but is not limited to, the following: 1. Furnish and provide services for the MVMC as specified in Section 26 08 39. 2. Furnish and provide services for the VFD as specified in Section 26 29 23. 3. Startup and warranty services as specified in Division 01 and 26. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Generation (CCGT) projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- TENANT IMPROVEMENT FOR A NAIL SALON, ELECTRICAL, VENT IN BATHROOM
