Front Bus Loop Repaving
One of 10,000+ projects Taiyo tracks in South Carolina.
Source: Dodge USA
Location: McCants Middle School 2. Remove existing asphalt. (see map on page 4) 3. Contractor is responsible for hauling off all excess materials. 4. Contractor will be responsible for all locates in the Work Zone (if needed). 5. Check existing Base Stone to ensure 4 stone base. Add material if needed. 6. Add 2 Binder 7. Add 2 Surface Mix 8. Repaint Directional Arrows & Crosswalks in their previou
- Status
- Closed
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Anderson, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Front Bus Loop Repaving
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Location: McCants Middle School 2. Remove existing asphalt. (see map on page 4) 3. Contractor is responsible for hauling off all excess materials. 4. Contractor will be responsible for all locates in the Work Zone (if needed). 5. Check existing Base Stone to ensure 4 stone base. Add material if needed. 6. Add 2 Binder 7. Add 2 Surface Mix 8. Repaint Directional Arrows & Crosswalks in their previous locations 9. Repaint curbs that may get marked/scratched during the job completion 10. Repaint ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Anderson |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
