Front St. Underground Infrastructure T4 Upgrade Phase 3
Sector: Water Supply and Storage • Location: Georgetown, South Carolina, United States of America
Source: Dodge USA
This project is Phase 3 of Underground Electrical Upgrades along Front St. Phase 3 consists of upgrading the power distribution system associated with existing Transclosure T4 including single phase pad mounted transformers, primary and secondary cables, service cables as necessary, new electrical conduit, modifications to existing duct bank, and refurbishment of existing pull boxes and manhole.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Power Transmission, Government, Telecommunications
- Location
- Georgetown, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Front St. Underground Infrastructure T4 Upgrade Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is Phase 3 of Underground Electrical Upgrades along Front St. Phase 3 consists of upgrading the power distribution system associated with existing Transclosure T4 including single phase pad mounted transformers, primary and secondary cables, service cables as necessary, new electrical conduit, modifications to existing duct bank, and refurbishment of existing pull boxes and manhole. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Georgetown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Power Transmission, Government, Telecommunications |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
