Frontier Energy Storage Project
The owner, status and timeline of this project. A free account opens every field.
Source: Hoodline
A 302-megawatt battery energy storage system designed for four hours of discharge, planned as OG&E's first utility-scale battery energy storage system. The project aims to enhance grid reliability and address capacity shortfalls.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Power Transmission
- Location
- Ponca City, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Hoodline
ConstructChat
Ask ConstructChat about Frontier Energy Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 302-megawatt battery energy storage system designed for four hours of discharge, planned as OG&E's first utility-scale battery energy storage system. The project aims to enhance grid reliability and address capacity shortfalls. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Ponca City |
Source
Source | Hoodline |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Power Transmission |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
