Frozen Water Services Lowering Program- Phase 3, 4, 5 Acton, Oakville and Burlington
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Phases 3, 4 and 5 include the lowering and / or insulating of approximately 257 water services (from the watermain to the curb stop at the property line) in the Town of Halton Hills - Acton (Phase 3 - 71 water services), Town of Oakville (Phase 4 - 79 water services) and City of Burlington (Phase 5 - 107 water services) as a result of freezing complaints reported during the 2014 / 15 winter months
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Frozen Water Services Lowering Program- Phase 3, 4, 5 Acton, Oakville and Burlington
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phases 3, 4 and 5 include the lowering and / or insulating of approximately 257 water services (from the watermain to the curb stop at the property line) in the Town of Halton Hills - Acton (Phase 3 - 71 water services), Town of Oakville (Phase 4 - 79 water services) and City of Burlington (Phase 5 - 107 water services) as a result of freezing complaints reported during the 2014 / 15 winter months. This program will ensure continuity of service to residents and provide increased resilience against impacts of climate change. CWWF funding will enable the acceleration of the program and the system security benefits associated with the program. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
