Frunzensky Bridge, Samara, Russia
Sector: Automotive • Location: World
Source: Road Traffic Technology
The construction of Frunzensky bridge began in November 2015. Credit: PJSC Stroytransgaz. The bridge is scheduled to open in December 2018. Credit: PJSC Stroytransgaz. The bridge will have three lanes in each direction. Credit: PJSC Stroytransgaz. The bridge will be supported by 15 piers. Credit: PJSC Stroytransgaz. Frunzensky is a road bridge being constructed over Samara River and Bannoye Lake i
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The construction of Frunzensky bridge began in November 2015. Credit: PJSC Stroytransgaz. The bridge is scheduled to open in December 2018. Credit: PJSC Stroytransgaz. The bridge will have three lanes in each direction. Credit: PJSC Stroytransgaz. The bridge will be supported by 15 piers. Credit: PJSC Stroytransgaz. Frunzensky is a road bridge being constructed over Samara River and Bannoye Lake in the Samara region of Russia. The bridge will alleviate transport problems in Samara City and minimise traffic flow on the bridge in Glavnaya Street leading to Kuibyshev District. It will provide access to Federal Highway M-32 and the local roads. The bridge is being constructed as part of preparations for the FIFA World Cup 2018. It is expected to be crossed over by more than 39,500 vehicles a day in both directions. The bridge is supervised and operated by the Ministry of Transport and Roads of the Samara Region on behalf of the Samara regional Government. The bridge will have six lanes with three lanes in each direction. It will have a roadway breadth of more than 22m, and a length of approximately 667m. The depth of the trussed beam of the bridge will be 20m. It will have a 200m-wide and 12m-high clearance, which will allow easy passage of river vessels. The project also includes the construction of an 80m-long bridge across Bannoye Lake, and 71m-long overpass, and two traffic interchanges. The bridge will have a total of 15 piers, including eight on the Samara River, and seven on the Bannoe lake crossing. Five out of seven piers of the Bannoe lake crossing will be installed in the water area. The piers are being built on four reinforced concrete legs over which a span will be erected, which will be the base for the future motorway. The bridge construction will involve the use of 46,000m³ of reinforced concrete, 9,500t of metal structures, 1.14 million cubic metres of soil and 101,000m² of asphalt concrete pavement. The construction of Frunzensky began with the official ground-breaking ceremony, which was held at Samara in November 2015. The preparatory works for the bridge construction were completed in October 2015. The initial works included increasing the strength of the road surface and weak soil stabilisation at the foot of the embankment. Construction on pier No 8 on Samara River was completed by February 2016. Construction is underway on all fronts on the left bank and preparation work is underway on the right bank for the construction of bridge supports across the Samara River. Rosneft gasoline station will soon be dismantled to be replaced with Pier No.1 of the bridge. Two transport junctions will be built at Shosseynaya and Frunze streets. PJSC Stroytransgaz (JSC STG) was appointed as the general construction contractor for the project. The scope of the contract includes providing detailed design documentation to ensure the supply of materials and equipment, as well as perform construction, installation and commissioning works. Transportnye Kommunikatsii Proyekt was contracted to provide the design for the bridge. Samara Port and Stroytransflot supplied 168.66Mt of sand for the construction of the bridge up to March 2016. Stroyindustria supplied 3,882m³ of concrete for the construction of the bridge piers. Samara Plant and Test Plant SMiK provided approximately 1,500t of reinforced concrete structures for the bridge construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
