FSB Amelia Earhart Dam Control Tower Rehabilitation
Sector: Hydro • Location: Somerville, Massachusetts, United States of America
Source: Dodge USA
The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems.
- Status
- Under Construction
- Sector
- Hydro, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Commercial
- Location
- Somerville, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FSB Amelia Earhart Dam Control Tower Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the rehabilitation of the existing control tower at the Amelia Earhart Dam including upgrading plumbing, HVAC, electrical equipment, replacing the elevator, replacing roof, tower window curtain wall, windows, doors and finishes and installation of fire protection systems. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Somerville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- Clearlake Affordable Housing Project
- NEW SAVANNAH BLUFF LOCK & DAM REPAIR & RESTORATION - TIA
- INSTALL RCUT AT SR 515 & SR 325 (NOTELY DAM RD)
- Wichita & Affiliated Tribes Broadband Infrastructure Deployment Project and Broadband Use and Adoption Project
- Renovation of the potable water piping and distribution system from the Añarbe Dam to the Petritegi DWTP in Huesca (Spain)
- Antelope Creek Juvenile Fish Passage Improvement
- Removal of Centreville Dam, Centreville, MD: Hurricane Sandy Disaster Relief, DOI Proj MD089
- Environmental System Science (ESS)
