logo

FSB Basic Wing Substation Replacement

Sector: Power Generation (CCGT) • Location: Worcester, Massachusetts, United States of America

Source: Dodge

Project
Closed

UMASS Chan Medical School is seeking general contractors for Basic Wing Substation Replacement; Install pre-purchased substation and install new proposed electrical distribution within the Basic Wing of the Medical School.

Status
Closed
Sector
Power Generation (CCGT), Government, Hospital, Education, Commercial
Location
Worcester, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about FSB Basic Wing Substation Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FSB Basic Wing Substation Replacement” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Worcester, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

UMASS Chan Medical School is seeking general contractors for Basic Wing Substation Replacement; Install pre-purchased substation and install new proposed electrical distribution within the Basic Wing of the Medical School.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Worcester

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Hospital, Education, Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project