FSB Bennnett Hemenway Elementary School Electrification
Sector: Water Supply and Storage • Location: Natick, Massachusetts, United States of America
Source: Dodge
Installation of air to water heat pump chiller, including piping, insulation, concrete pad, chemical treatment, pumps, and control. Replacement of the automatic temperature controls building management system. Replacement of boilers with condensing boilers. Replacement of air handling equipment. Designer Services related Electrification and Energy Upgrades at Bennett-Hemenway (Ben-Hem) Elementary
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Chemical (Industrial), Manufacturing (Industrial), Commercial
- Location
- Natick, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FSB Bennnett Hemenway Elementary School Electrification
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of air to water heat pump chiller, including piping, insulation, concrete pad, chemical treatment, pumps, and control. Replacement of the automatic temperature controls building management system. Replacement of boilers with condensing boilers. Replacement of air handling equipment. Designer Services related Electrification and Energy Upgrades at Bennett-Hemenway (Ben-Hem) Elementary School in the Town of Natick. Buildings include: Ben-Hem at 22 East Evergreen Rd, Natick, MA 01760. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Natick |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Chemical (Industrial), Manufacturing (Industrial), Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
