FSB Breed Middle School Elevator Modernization
Sector: Power Generation (CCGT) • Location: Lynn, Massachusetts, United States of America
Source: Dodge USA
Project: The scope of work includes but is not limited to, the modernization of the existing passenger elevator including selective demolition, elevator equipment (machine room, hoistway, cab and landings), selective structure, mechanical, electrical and fire alarm system. Sub Bid Divisions: 14,16,GC
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Government, Commercial, Education
- Location
- Lynn, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FSB Breed Middle School Elevator Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project: The scope of work includes but is not limited to, the modernization of the existing passenger elevator including selective demolition, elevator equipment (machine room, hoistway, cab and landings), selective structure, mechanical, electrical and fire alarm system. Sub Bid Divisions: 14,16,GC |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Lynn |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Commercial, Education |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
