FSB Brookline Senior Center Electrification
Sector: Water Supply and Storage • Location: Brookline, Massachusetts, United States of America
Source: Dodge USA
The Project consists of but not limited to: a replacement of the existing roof mounted air-cooled chiller with an air-source heat pump chiller that shall provide both heating hot water and chilled water to the building. The new heat pump chiller shall be provided with appropriate mechanical and electrical infrastructure to be incorporated into the existing hot water and chilled water mechanical sy
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Road, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Brookline, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FSB Brookline Senior Center Electrification
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of but not limited to: a replacement of the existing roof mounted air-cooled chiller with an air-source heat pump chiller that shall provide both heating hot water and chilled water to the building. The new heat pump chiller shall be provided with appropriate mechanical and electrical infrastructure to be incorporated into the existing hot water and chilled water mechanical systems. The existing boiler plant shall remain, and associated piping shall be modified in a manne... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brookline |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Road, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
