FSB Chestnut Street Water Pumping Station Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The work consists of the replacement of existing pumps, suction and discharge piping, and isolation valves, demolition of interior generator and fuel tank, installation of exterior diesel generator with belly tank, relocation of existing chemical systems, masonry work to expand the existing bathroom, and associated plumbing, HVAC, and electrical upgrades.
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Road
- Location
- East Longmeadow, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FSB Chestnut Street Water Pumping Station Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of the replacement of existing pumps, suction and discharge piping, and isolation valves, demolition of interior generator and fuel tank, installation of exterior diesel generator with belly tank, relocation of existing chemical systems, masonry work to expand the existing bathroom, and associated plumbing, HVAC, and electrical upgrades. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | East Longmeadow |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
