logo
ProjectBidding, Bid Results

FSB Digester Fixed Cover Replacement

Bidding, bid results · Massachusetts · Last reported Dec 2023

Source: Dodge USA

Scope - The work includes the demolition of the existing concrete dome cover of the fixed cover digester, erection, installation, and testing of a new stainless steel dome cover on the digester, including associated structural, mechanical, electrical and other work as required to complete the project at the Clinton Wastewater Treatment Plant in Clinton, MA.

Status
Closed
Sector
Water Supply and Storage, Cement, Power Generation (CCGT), Steel, Waste Processing and Treatment, Metal, Commercial
Location
Clinton, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FSB Digester Fixed Cover Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FSB Digester Fixed Cover Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Clinton, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding, Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope - The work includes the demolition of the existing concrete dome cover of the fixed cover digester, erection, installation, and testing of a new stainless steel dome cover on the digester, including associated structural, mechanical, electrical and other work as required to complete the project at the Clinton Wastewater Treatment Plant in Clinton, MA.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Clinton

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Power Generation (CCGT), Steel, Waste Processing and Treatment, Metal, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project