FSB Fall River Armory Renovation
Sector: Power Generation (CCGT) • Location: Fall River, Massachusetts, United States of America
Source: Dodge USA
Scope - The Project includes Materials, Labors and Equipment for Renovation of the Fall River Army National Guard Armory, which includes updating of electrical and mechanical systems, hazmat abatement, new roof, replacement of door and window systems, and installation of a roof mounted solar array.
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar, Commercial, Manufacturing (Industrial)
- Location
- Fall River, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FSB Fall River Armory Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The Project includes Materials, Labors and Equipment for Renovation of the Fall River Army National Guard Armory, which includes updating of electrical and mechanical systems, hazmat abatement, new roof, replacement of door and window systems, and installation of a roof mounted solar array. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Fall River |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
