logo
ProjectClosed

FSB Hillside Stable Structural Repairs & Renovation Ph 3

One of 10,000+ projects Taiyo tracks in Massachusetts.

Source: Dodge USA

The project consists of: The structural repairs & renovation of the Hillside Stable, including but not limited to the replacement of the first-floor structure, temporary shoring, siding repairs and replacement, exterior trim repairs, window repairs, plumbing work, electrical work, mechanical work, site drainage modifications, and various repairs and renovations as indicated in the drawings

Status
Closed
Sector
Commercial, Power Generation (CCGT), Residential, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment
Location
Milton, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FSB Hillside Stable Structural Repairs & Renovation Ph 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FSB Hillside Stable Structural Repairs & Renovation Ph 3” is an infrastructure initiative in the Commercial sector, located in Milton, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of: The structural repairs & renovation of the Hillside Stable, including but not limited to the replacement of the first-floor structure, temporary shoring, siding repairs and replacement, exterior trim repairs, window repairs, plumbing work, electrical work, mechanical work, site drainage modifications, and various repairs and renovations as indicated in the drawings

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Milton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Residential, Road, Government, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project