FSB MRVWD Water Treatment Plant Upgrades
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge USA
The work of this contract generally consists of water treatment plant (WTP) upgrades at the Mattapoisett River Valley Water District WTP including removal and replacement of the existing ultrafiltration (UF) system at the WTP with a new Kovalus Separation Solutions, LLC, PURON MP 64 UF system and appurtenances. The equipment for the new UF system was pre-purchased by the Owner and will be furnishe
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Waste Processing and Treatment
- Location
- Mattapoisett, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FSB MRVWD Water Treatment Plant Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work of this contract generally consists of water treatment plant (WTP) upgrades at the Mattapoisett River Valley Water District WTP including removal and replacement of the existing ultrafiltration (UF) system at the WTP with a new Kovalus Separation Solutions, LLC, PURON MP 64 UF system and appurtenances. The equipment for the new UF system was pre-purchased by the Owner and will be furnished to the Contractor for installation only. Work also includes, but is not limited to, furnishing ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Mattapoisett |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Waste Processing and Treatment |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
