FSB Nagle Building Fire Suppression System Upgrade
Sector: Power Generation (CCGT) • Location: Fall River, Massachusetts, United States of America
Source: Dodge
Fall River Nagle Building Fire Suppression System Upgrade. Work shall include, but not limited to, selective demolition, replacement of existing fire suppression system, masonry, acoustical ceilings and suspension systems, metal doors and frames, door hardware, firestopping, electrical, HVAC.
- Status
- Closed
- Sector
- Power Generation (CCGT), Metal, Manufacturing (Industrial), Commercial, Residential, Cement, Government
- Location
- Fall River, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FSB Nagle Building Fire Suppression System Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fall River Nagle Building Fire Suppression System Upgrade. Work shall include, but not limited to, selective demolition, replacement of existing fire suppression system, masonry, acoustical ceilings and suspension systems, metal doors and frames, door hardware, firestopping, electrical, HVAC. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Fall River |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Metal, Manufacturing (Industrial), Commercial, Residential, Cement, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
