FSB Red Mill Road Water Treatment Plant PFAS Upgrades
Closed · Massachusetts · Last reported Jan 2025
Source: Dodge
The Work under this Contract includes, but is not necessarily limited to, the construction of PFAS Treatment equipment at the existing Red Mill Road Water Treatment Plant. The PFAS treatment equipment will include: chemical storage tanks and chemical feed systems; PFAS treatment system; and associated architectural, process piping, instrumentation and controls, HVAC, and electrical work to provide
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Generation (CCGT), Road, Chemical (Industrial), Manufacturing (Industrial), Commercial
- Location
- Easton, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about FSB Red Mill Road Water Treatment Plant PFAS Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work under this Contract includes, but is not necessarily limited to, the construction of PFAS Treatment equipment at the existing Red Mill Road Water Treatment Plant. The PFAS treatment equipment will include: chemical storage tanks and chemical feed systems; PFAS treatment system; and associated architectural, process piping, instrumentation and controls, HVAC, and electrical work to provide a fully functional PFAS treatment system as shown in the Contract Drawings. All work shall be co... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Easton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Generation (CCGT), Road, Chemical (Industrial), Manufacturing (Industrial), Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
