logo

FSB Red Mill Road Water Treatment Plant PFAS Upgrades

Sector: Water Supply and Storage • Location: Easton, Massachusetts, United States of America

Source: Dodge USA

Project
Gc Bidding

The Work under this Contract includes, but is not necessarily limited to, the construction of PFAS Treatment equipment at the existing Red Mill Road Water Treatment Plant. The PFAS treatment equipment will include: chemical storage tanks and chemical feed systems; PFAS treatment system; and associated architectural, process piping, instrumentation and controls, HVAC, and electrical work to provide

Status
Under Construction
Sector
Water Supply and Storage, Chemical (Industrial), Road, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)
Location
Easton, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about FSB Red Mill Road Water Treatment Plant PFAS Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “FSB Red Mill Road Water Treatment Plant PFAS Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Easton, Massachusetts, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work under this Contract includes, but is not necessarily limited to, the construction of PFAS Treatment equipment at the existing Red Mill Road Water Treatment Plant. The PFAS treatment equipment will include: chemical storage tanks and chemical feed systems; PFAS treatment system; and associated architectural, process piping, instrumentation and controls, HVAC, and electrical work to provide a fully functional PFAS treatment system as shown in the Contract Drawings. All work shall be co...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Easton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Chemical (Industrial), Road, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)

Article published date

2025-01-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project