FSB Washington Irving School Reconfiguration - Phase 2
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge USA
The scope of work is further detailed in the specifications; the project consists of the existing Washington Irving Elementary School Project shall be fully renovated and provided with a three (3) story 5000 SF new addition. Replacement of all MEP systems, fire protection systems, and new fire alarm system
- Status
- Closed
- Sector
- Government, Commercial, Education, Manufacturing (Industrial)
- Location
- Boston, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FSB Washington Irving School Reconfiguration - Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work is further detailed in the specifications; the project consists of the existing Washington Irving Elementary School Project shall be fully renovated and provided with a three (3) story 5000 SF new addition. Replacement of all MEP systems, fire protection systems, and new fire alarm system |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Education, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
