FSB West Street Fe and Mn Water Treatment Plant
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work consists of the construction of a new water treatment plant (WTP) for the West Street Well, modifications to the existing wellhouse, and drilling and installation of a redundant, replacement well. Bids shall be on a lump sum basis, as indicated in the Bid Form.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- East Brookfield, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FSB West Street Fe and Mn Water Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of the construction of a new water treatment plant (WTP) for the West Street Well, modifications to the existing wellhouse, and drilling and installation of a redundant, replacement well. Bids shall be on a lump sum basis, as indicated in the Bid Form. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | East Brookfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
