FSB WPCF Improvements Phase 2
Sector: Road • Location: Wareham, Massachusetts, United States of America
Source: Dodge USA
The project involves renovations and improvements to an existing 1.56 MGD water pollution control facility located at 6 Tony s Lane, Wareham, MA. This project includes upgrades to the Headworks Building and addition of new Secondary Clarifiers. Ancillary equipment replacement and process upgrades will be performed including headworks equipment, sludge pumping, dewatering odor control system, archi
- Status
- Closed
- Sector
- Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Government, Manufacturing (Industrial)
- Location
- Wareham, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about FSB WPCF Improvements Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves renovations and improvements to an existing 1.56 MGD water pollution control facility located at 6 Tony s Lane, Wareham, MA. This project includes upgrades to the Headworks Building and addition of new Secondary Clarifiers. Ancillary equipment replacement and process upgrades will be performed including headworks equipment, sludge pumping, dewatering odor control system, architectural renovations to existing Headworks Building, and construction of new Alkalinity Building ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Wareham |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Government, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
