FSTTRK 1 Blackfan CI
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Remove existing fish lab equipment and associated plumbing and install new filtered water system including waste waterpiping. Provide new entry door and new wall and floor finishes. Work to be completed in two phases as shown on Drawings ans specifications by TRO Jung/Brennan Architects and RDK Engineers.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about FSTTRK 1 Blackfan CI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove existing fish lab equipment and associated plumbing and install new filtered water system including waste waterpiping. Provide new entry door and new wall and floor finishes. Work to be completed in two phases as shown on Drawings ans specifications by TRO Jung/Brennan Architects and RDK Engineers. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
