FSTTRK 1 Summer ST
Open · Massachusetts
Source: City of Boston
build out of datacenter on the 5th floor. work includes construction of new demising walls, chilled water piping, installation of a pre action fire suppression system to be tied into the existing fire alarm system and electrical work required to support approximately 5900 sq feet of data center space. as per plans
- Status
- Prospective
- Sector
- Water Supply and Storage, Data Center, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about FSTTRK 1 Summer ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | build out of datacenter on the 5th floor. work includes construction of new demising walls, chilled water piping, installation of a pre action fire suppression system to be tied into the existing fire alarm system and electrical work required to support approximately 5900 sq feet of data center space. as per plans |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Data Center, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
