FSTTRK 1 Summer ST
Open · Massachusetts
Source: City of Boston
4th Floor - Markley A-Loop Maximization project scope of work to include drywall repairs and new door and VCT installations in Suite 411. Expansion of existing chilled water cooling loop, installation of new roof top and computer room HVAC equipment. Installation of structural steel platform for new roof top HVAC equipment. Expansion of existing electrical power systems for Suite D data center.
- Status
- Prospective
- Sector
- Water Supply and Storage, Data Center, Power Generation (CCGT), Steel, Commercial, Government, Metal
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about FSTTRK 1 Summer ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 4th Floor - Markley A-Loop Maximization project scope of work to include drywall repairs and new door and VCT installations in Suite 411. Expansion of existing chilled water cooling loop, installation of new roof top and computer room HVAC equipment. Installation of structural steel platform for new roof top HVAC equipment. Expansion of existing electrical power systems for Suite D data center. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Data Center, Power Generation (CCGT), Steel, Commercial, Government, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
